Our site uses cookies necessary for its proper functioning. To improve your experience, other cookies may be used: you can choose to disable them. This can be changed at any time via the Cookies link at the bottom of the page.


PE technical guidance
HDPE Pipe technical guidance (High quality Polyethylene Pipes)
 
Construction

How can I verify details of the pipes and fittings that have been installed?

Quick access

Good Quality Assurance by the contractor is necessary to achieve this.

The contractor should record location of pipes to provide suitable location in the future and this should be carried out in accordance with the operator's or contractor's QA system. Normal practice is to record the location on maps and this is now made easier with GPS systems.

Although it may not be necessary to record details of individual pipe lengths, other than diameter and PN rating, it may be beneficial to record joint and fitting locations. The record of the joint and fitting location can be used in conjunction with jointing data logging facilities to provide a cross-reference with the pipe and fittings installed.

Information on Traceability - link to PE pipe : Pipe origin and fittings


Last update Wednesday 27 March 2024

Members of the Association

BOREALISBOROUGEFormosa Plastics CorporationHanwha TotalEnergiesINEOS O&PIRPCKorea Petrochemical IND. Co., LTD (KPIC)LyondellBasellORLEN UnipetrolPetroChina Dushanzi Petrochemical CompanyPRIME POLYMERSABICSCG Chemicals & Thai PolyethyleneSinopecTASNEE